As a conclusion of Phase 1, a List of Requirements was made. As seen on the right, it was divided into four categories, with one being "General" and the rest being specific to each of the Concept Directions, discussed in the next subsection. The reason for this division was a great difference between each of the categories, which made it difficult to include all in one, undivided LoR. The List of Requirements, in the form here, was approved by Anne. The list was later used to help with evaluating the Concept, but also as a guide in Concept creation.